Records brief
Run the checker first, then open the records brief from the result.
This page turns the current checker result into a sendable LL152 records brief. Use it when the building operator needs the likely path, the reply path, and the records to send back today.
- Use this as the default end-user document before you ask for another cleanup loop.
- Use print or save PDF when the board, ownership group, or file needs a fixed document.
- Use the document link only when a browser copy is easier than an attachment.
Why you received this
This brief summarizes which LL152 filing path likely applies to this building.
Send today
Send the records you already have that help settle the LL152 path.
Reply path
Reply on the same email or text thread that delivered this document.
Prepared for building operator review
Records brief
Prepared LL152 records brief
Reply contact
Reply contact
Case reference
Assigned after the brief opens
Building reference
Current building
Building address
Current building address
BIN
Current BIN
BBL
Current BBL
If you do not know the BIN or BBL, reply with the building address and a photo of the notice first.
Before you send this
Add the full building address or a BIN/BBL before you send this.
This preview is not ready to send, print, or copy until the building reference is strong enough to match the file without another follow-up call.
What to send now
Start with the records you already have.
Use the records below so the LL152 filing path can be confirmed before anyone files against the wrong path.
Current filing path
The current filing path appears here.
Why this filing path is likely
- Coverage appears here.
- Timing appears here.
What you need to send now
The current ask appears here.
Send now
- The minimum send-now records appear here.
Helpful if you have it
- The helpful records appear here.
- The fallback records appear here.
What not to do yet
The do-not-do-yet note appears here.
The current review is still checking the LL152 filing step that is still open for this building.
Reply path
Reply on the same email or text thread that delivered this brief. If this brief was forwarded, ask the sender to confirm the reply contact before you send records.
Reply today
Reply with the records that settle the current LL152 path.
Use one reply to confirm the filing path before anyone files against the wrong path.
- The reply-today checklist appears here.
What happens next
After your reply, the next check is which filing step is still open.
The next-step summary appears here.
- The reply checklist appears here.
Background notes
Use the rest of this page only when the building operator needs more context.
What this means
The records brief summary appears here.
The branch note appears here.
Do not assume
The key warning appears here.
The branch distinction appears here.
Timing that matters now
The timing note appears here.
The pause boundary appears here.
Official basis
- Official references appear here.
Official guide
Open the official guide
Based on the records reviewed so far, this is the current LL152 filing path. Confirm against DOB and utility records before filing.
This live records brief uses a token link, not the building address, BIN, or BBL in the URL. Open the fixed print surface when the file needs a clean PDF attachment.
Ready after the records brief opens.