Next-step guide
LL152 filing next step after inspection, GPS1, or GPS2
Use this page when the building already looks covered and the open question is what gets filed next, who acts next, and which document starts the sequence.
NYC Local Law 152
Start with the building facts you already know. The checker narrows coverage, due timing, and the gas-status split before you spend time in DOB NOW.
See whether the building is likely covered and whether the live problem is this cycle or a missed one.
Separate no gas piping, no active gas service, and active service before you move to the next filing step.
Checked 2026-04-14 against 6 official city references.
Built for owners, supers, and managers
Start with the question
Use the page that matches the blocker. Use the checker when the blocker is still unclear.
Due now
Start here when you still need the likely coverage, current cycle timing, or the gas-status split.
Next filing step
Use this when the building already looks covered and the main question is what gets filed next.
Gas-status split
Use the comparison page that prevents the most common LL152 filing mistake before you open DOB NOW.
Penalty or waiver
Use this when the original due window may already be behind the building and the open issue is penalty, challenge, or waiver.
After inspection
Use this timing page after the inspection branch is already clear and the next issue is submission timing.
Core guides
These are the most repeated direct questions. Anything still unresolved belongs in the checker first.
Next-step guide
Use this page when the building already looks covered and the open question is what gets filed next, who acts next, and which document starts the sequence.
Scenario split
Use this comparison page when you need to separate the two most common LL152 branch mistakes before you file or open DOB NOW.
No gas piping path
Use this page when the building truly has no gas piping and you need to know who can certify it, what to collect, and why the filing is different from no active gas service.
No active service path
Use this page when gas piping still exists but the building no longer has active gas service and you need the recurring documentation path, not the no-gas-piping page.
If none of these direct guides match the case, run the checker before you pick a filing path.
Self-serve when
Keep moving when the remaining work is just preparation, timing, or sequence.
Contact now when
Send case details before the wrong filing step creates cleanup.
Trust and boundaries
Privacy, disclosure, and methodology live here so the filing question stays separate from everything else.
Operator
Source-checked LL152 guidance for narrow NYC filing questions. Use it to narrow the next filing step before you act in DOB NOW.